About this site

StreetCase Sacramento turns public crash records into a plain-language case for a safer street, and helps you send it to the people who can act.

How fresh the data is

Checking the data.

Crash reports reach the state system about a week after a crash, and recent reports can still change. We refresh the crash data every week.

Data sources

Methods

What counts as which crash

Sun glare

We work out where the sun was at the reported crash time. A crash counts as "in low sun" when the sun was 0 to 15 degrees above the horizon and within 25 degrees of either direction of the road, in daylight or at dusk or dawn, in clear weather. This shows when glare was likely, not that it caused the crash. The monthly table uses the 15th of each month.

Fixes

Each proven fix has simple rules, such as "four or more lanes and someone walking or biking was killed or seriously hurt". A fix shows up when its rules match the report. We show up to 5, most specific first. Engineers make the final call.

Who can fix it

We find the city or county, districts and community area by checking which boundary the spot falls in. Then we list the road owner's staff, the elected officials for those districts, advisory groups, regional and state contacts, and local advocacy groups. Only contacts we confirmed on an official page are used.

Corridor ranking (region view)

Named roads (not freeways) are split into stretches of about half a mile. Walking and biking crashes within 30 meters of a stretch, and coded on that road, count toward it. Score = (3 times crashes that killed or seriously hurt someone + 1 times other injury crashes) per mile. Stretches shorter than a quarter mile are counted as a quarter mile, so one corner does not top the list. A stretch needs at least 2 such crashes to be ranked.

Projects and money

The projects pages track a hand-picked set of street projects, not every project. We started with walking, biking and safety projects, and added some road widening and transit projects for comparison. Stage, dates and money come from the Caltrans safety grant (HSIP) status report, Sacramento County project pages, state Active Transportation Program lists and the 2026 State Transportation Improvement Program. Each fact links to its source and the date we read it. A project is called complete only when a source says so. The type of project and who it serves are our own labels. The lines on the map are drawn by us between the cross streets the source names.

"Where the money goes" shows how the City of Sacramento, Elk Grove and Sacramento County split their own transportation budgets, in their own words and over their own years. Those splits cannot be lined up as a fair comparison of places, so we show each one on its own. For finished projects, we compare crash counts in equal time windows before and after. That is a count, not a study, and it cannot show that a project caused a change. We flag any project we have not re-checked in 90 days.

Limits

Privacy